SI Cost Estimator

Estimate a soil-investigation budget: an 11-item Bill of Quantities priced Low/Mid/High.

About the Geotechnical Investigation Cost Estimate Tool

This cost-estimation tool provides a preliminary evaluation of the expected cost of geotechnical site investigation works for building projects. The tool was primarily developed for projects located in the Middle East and GCC region.

Users should note that the exact investigation scope must always be defined by qualified geotechnical professionals, as project-specific conditions can significantly influence the required works. Adequate budgeting for soil investigation is essential to properly quantify and mitigate geotechnical risks.

When selecting a geotechnical investigation subcontractor, cost alone should not be the deciding factor. A technical evaluation by experienced experts is recommended to ensure the proposed methods, equipment, accreditation, and workmanship meet project requirements.

This tool is intended solely as a rough, preliminary cost-estimation aid. It is advisable to obtain at least three formal quotations from reputable soil investigation subcontractors before finalizing the project budget.

Development Basis

This tool is primarily derived from Orycta’s in-house expertise and historical cost data, based on extensive experience reviewing and evaluating soil investigation proposals for residential and commercial building projects across the UAE and wider GCC region.

Other References

BS 5930:2015+A1:2020 — Code of Practice for Ground Investigations, British Standards Institution.

EN 1997-2:2007 — Eurocode 7: Geotechnical Design, Part 2: Ground Investigation and Testing, European Committee for Standardization (CEN).

ASTM D420 — Standard Guide for Site Characterization for Engineering, Design, and Construction Purposes, ASTM International.

Orycta Orycta
link Scope carried in from the SI Scope Calculator — borehole count and depth pre-filled.
Currency
Investigation Scope
Enter values from the Scope Calculator (Tool 1)
Included Items
Bill of Quantities
payments

Set the scope and included items, then press Generate Estimate — the Low / Mid / High budget bands appear here.

Estimate
Low Estimate · excl. VAT
Mid Estimate · excl. VAT
High Estimate · excl. VAT
ItemQty LowMidHigh
Note · This tool is applicable for onshore investigations only.

Disclaimer

This tool provides preliminary budget estimates for planning purposes only. The estimated costs are indicative in nature and must not be used for procurement, tendering, contractual commitments, or project execution. Actual costs will vary depending on project-specific requirements, site conditions, access constraints, testing requirements, market conditions, and the final scope defined by a qualified geotechnical engineer. Budgets should be established using formal quotations obtained from qualified service providers. Orycta makes no representation or warranty regarding the accuracy, completeness, or suitability of the estimates generated by this tool and accepts no liability arising from its use.

EN 1997-2:2007 Annex B.3 · BS 5930:2015+A1:2020 · ASTM D420 · Obtain ≥3 formal quotations before finalising budget.